Submitted by mcoddens on Mon, 2014-01-27 13:40 Posted in Gary Borger - 596 Vote Up Down +29 + P6280078.JPG Drilling post holes P6280102.JPG Finished project P6280072.JPG Floating Posts P6280093.JPG Making manmade P6280086.JPG Securing platform to top P6280083.JPG Water pressure drilling This river restoration project included removing river platforms and replacing them with new structures. New posts were set in place using water pressure to drill holes in the river bottom. On top of the posts, structures were built by repurposing logs and wood from the old platforms. This collaboration inlcuded DNR, summer college interns, and volunteers from TU.